A Time Saving Buffing Process
How can three steps be faster and more economical than one step. In the metal finishing and buffing process sometimes a more strategic process is faster than the traditional process.
To save time and money, the following process will provide the same quality finish but with a dramatic time savings to your buffing department.
For economy of labor and materials, the buffer should first determine how much color is required. Keeping in mind how much time is required by preceding the color buff operation with one or more cut or cut/color operations.
A Little Time and Planning Saves a lot of Costs and Labor
|
Buffing Process #1 |
Buffing Process #2 |
|
|
|
||
![]() |
![]() |
|
|
5 Hours Color Buffing Only |
1 Hour Cut Buffing |
|
|
Equals Approximately 5 Hours |
Equals Approximately 3 Hours |
|